References – Technical University
About the project
In order to meet today’s technical requirements, the existing Chemistry and Physics Department building of the TU Dortmund is to be completely core-refurbished. To enable the renovation to be carried out in sections, a replacement building has been erected for the department, to maintain research operations and for the relocation of the respective chemistry and physics laboratories and work areas.
The new six-storey building situated at Otto-Hahn-Straße 4a includes two practical training halls for physical chemistry. In addition, there is a centre for large-scale equipment in the basement, in which several nuclear magnetic resonance spectrometers (NMR) will be operated in the future
Further information
- Start of planning: 2013
- Completion: 2016
- Refurbishment of existing building, setting-up and equipping of research laboratories and offices in the replacement construction
-
Photos:
Andreas Secci, Bochum