DELTA 30 forward back
Plumbing
  • Variable arrangement of laboratory service fittings along the entire system length
  • Pure gas installations in accordance with requirements
  • Service fittings including add-ons such as pressure reducers can be supplied in various assemblies depending on the system
  • Supply lines from ceiling or floor
  • Pre-installations with all safety and pressure tests
  • Covered pipe lines
 

  Electric
  • Variable assembled with built-in equipment from the standard range and special components
  • Flexible channel division into up to 4 chambers
  • Labyrinth seal for splash protection IP54
  • Installation of data networks
  • Optional: miniature circuit breakers, residual current operated circuit breakers
  • Facia guidance groove with safety device against dropping out when channel is open